-
- Downloads
[TDF] Change behaviour of Report and add example
now, if the chain did not run yet upon a call to Report, the event loop is triggered. This is useful when an analysis on cut efficiencies is to be performed without having to expose the Run method in the interface and without requiring to book fake actions.
Showing
- tree/treeplayer/inc/ROOT/TDataFrame.hxx 3 additions, 3 deletionstree/treeplayer/inc/ROOT/TDataFrame.hxx
- tree/treeplayer/src/TDataFrame.cxx 14 additions, 9 deletionstree/treeplayer/src/TDataFrame.cxx
- tutorials/dataframe/tdf004_cutFlowReport.C 84 additions, 0 deletionstutorials/dataframe/tdf004_cutFlowReport.C
Loading
Please register or sign in to comment