Commit 6d626c46 authored by Zhang Huanjie's avatar Zhang Huanjie
Browse files

Merge branch 'master' of github.com:ustcnic/docs

parents 9dcea9b5 0b235f60
...@@ -29,6 +29,7 @@ ...@@ -29,6 +29,7 @@
| 218.22.21.0 | 218.22.21.31 | 255.255.255.224 | 32 | 中国电信 | | 218.22.21.0 | 218.22.21.31 | 255.255.255.224 | 32 | 中国电信 |
| 218.22.22.160 | 218.22.22.191 | 255.255.255.224 | 32 | 中国电信(Port2) | | 218.22.22.160 | 218.22.22.191 | 255.255.255.224 | 32 | 中国电信(Port2) |
| 218.104.71.160| 218.104.71.175 | 255.255.255.240 | 16 | 中国联通 | | 218.104.71.160| 218.104.71.175 | 255.255.255.240 | 16 | 中国联通 |
| 218.104.71.96 | 218.104.71.111 | 255.255.255.240 | 16 | 中国联通 |
| 202.141.176.0 | 202.141.191.255 | 255.255.240.0 | 16C | 中国移动(科大自有IP) | | 202.141.176.0 | 202.141.191.255 | 255.255.240.0 | 16C | 中国移动(科大自有IP) |
| 121.255.0.0 | 121.255.255.255 | 255.255.0.0 | 1B | 中国移动(科大自有IP) | | 121.255.0.0 | 121.255.255.255 | 255.255.0.0 | 1B | 中国移动(科大自有IP) |
......
1. 机房分期建设,预留空间和承重等特殊需求。
2. 交付的是空房间,机房内的制冷、UPS、机柜等设备由学校建设。
2. 1-4层房间按照机房和辅助用房使用设计,机房区域的房间地面下沉80cm以安装制冷设施和管道。
3. 5层房间承重按照机房区域设计,地板不下沉(注意层高要足够高)。
4. 顶楼预留安装制冷装置的空间,承重需求。
5. 充分考虑柴油发电机、制冷设备的噪音对周边的影响。
6. 货梯尺寸及承重考虑